Toptk_dk_kontakttk_dk_forsidetk_dk_sprog

Front Page

Profile

Capacity

Customer survey

Referencer

Adjustable Calibrating Sleeve

Crew
sikker_levprintsog_dk
blaa_1x1
Production facilities
RIVAL updates its technology
Large CNC milling machines
Kiheung CNC milling machine
CNC Multi-Tasking Machining
CNC Horizontal Machining Center
MAZAK FH10800 Horizontal Machining Center
MAZAK FH6800 Horizontal Machining Center
Large lathes
Small lathes
Vertical machining
CNC die sinking EDM machine
3D machining
Development tasks
top_news.jpg

RIVAL's new production facilities

Fabrikshal_570.jpg

RIVAL’s new 2000 m2 production facilities, featuring a 350 m2 administration department on two floors, were officially inaugurated on 1 August 2008.

RIVAL has expanded, both in terms of staff and floor space. Instead of a traditional industrial building, we chose an architectural statement that respects not only the surroundings but the welfare of the staff who work there.

The scenery here in Svejstrup is absolutely stunning, and it would really have been a shame for staff to see it only on their way to and from work. We therefore asked the architect to draw a building that would let in plenty of light and air, as well as the beautiful views. It’s a natural thing in other industries to think about staff welfare, and it should come naturally to us, too.

The 2,000 m2 building offers stunning views of Søhøjlandet. The building itself was constructed of steel and brick, with large windows overlooking the water and the woods. Inside, noise has been reduced and the premises are light and let in lots of fresh air.

Needless to say, our aim is also to recruit and retain staff who value a positive working environment and a good working climate. Good staff are in great demand, and with our corporate profile we have to recruit the best.

blaastreg
RIVAL · Svejstrupvej 23 · DK-8660 Skanderborg · Tel.: +45 86 57 71 77 · Fax: +45 86 57 71 33 · sales@rival.dk
bund2bund3bund4bund5bund6bund7bund8